Implementation 1 – external installation connection
Construction of a pipe connection to the building in an excavation, including sealing the passage through the foundation wall. Earthworks and installation of underground systems.

Implementation 2 – foundations for the structure/slab
Excavation and concrete foundation slabs for a technical facility. Preparation for further construction work.

Implementation 3 – external sewage system
Installation of a sewer pipeline in a trench, including an inspection chamber. Installation carried out in native soil.

Implementation 4 – sewerage system installation in a narrow-space excavation
Laying a sewer pipe in a deep, narrow trench. Work requiring the securing of trench walls.

Implementation 5 – underfloor installations
Laying pipe installations in the ground before pouring concrete. Part of the preparatory stage for the floor.

Implementation 6 – reinforced concrete slab / industrial floor
Preparation and reinforcement of a concrete slab in an industrial facility. Stage prior to concreting.

Implementation 7 – industrial floor after completion
Ready, hardened floor in a production hall or warehouse. Surface prepared for use.

Implementation 8 – concrete tank/basin
Construction of a sealed concrete basin inside the facility. Part of a technological or drainage system.

Implementation 9 – trough/technological gutter with protective coating
Finishing a concrete technological element with a specialized coating. Protection against moisture and chemicals.

Implementation 10 – reinforcement of the foundation for an industrial hall
Execution and installation of reinforcement, including preparation for concreting of the load-bearing structure.

Implementation 11 – installation of a concrete well
Installation of a prefabricated well in an excavation, including the construction of a concrete base.

Implementation 12 – installation of a heat distribution unit/heating system
Installation of a compact heating system with automation and connections.

Implementation 13 – installation of industrial flooring
Installation of a resin floor with high mechanical resistance.

Implementation 14 – demolition works on concrete flooring
Removing old concrete and preparing the substrate for new layers.

Implementation 15 – installation of tanks and sewage system
Installation of concrete tanks with connection of sewer pipes.

Implementation 16 – delivery and assembly of a steel tank
Installation of a process tank for industrial use.

Implementation 17 – construction of foundations for machines
Concreting and reinforcing technological foundations

Implementation 18 – assembly of steel structures / bumpers
Installation of safety and structural elements within the plant premises.

Implementation 19 – installation of steel foundation/platform
Installation of a prefabricated steel platform mounted on a concrete foundation, intended for the assembly of technological equipment in the outdoor area of the plant.

Implementation 20 – construction and installation of technological foundations
Construction of reinforced concrete foundations with anchoring elements for technological lines and load-bearing structures inside the production hall.